Made of Steel – New Buy American Act Rules Change Analysis and Increase Barriers to Offers of Foreign Manufactured End Products and Construction Material, Particularly for Iron or Steel Products
Client Alert | 1 min read | 09.14.20
Today, nearly 8 months after the deadline, the FAR Council has issued a proposed rule to implement E.O. 13881 (July 15, 2019) requiring consideration of increasing both the domestic content requirement under the Buy American Act and the associated price preference provided to domestic products. The proposed rule will do both and include new provisions applicable to end products or construction material “predominantly of iron or steel or a combination of both.” Most significantly, the proposed rule will:
- Require non-COTS domestic end products and construction material to include domestic components that exceed 55% of the cost of all components for the end product; COTS end products, with the notable exception of the new category of items “predominantly of iron or steel or a combination of both” will continue to need only be manufactured in the United States to qualify as domestic.
- Require domestic end products or construction material (including COTS items but except fasteners) consisting “predominately of iron or steel or a combination of both” to be manufactured in the U.S. and not incorporate foreign iron or steel that comprises 5% (on an estimated basis) or more of the costs of all components of the end product. To qualify as an item “predominately of iron or steel or combination of both” the total cost of iron and steel content in the item must exceed 50% of the cost of all components. Similar to rules applicable to Recovery Act procurements and DOT-funded programs, to qualify as domestic iron or steel “all manufacturing processes of the iron or steel must take place in the United States, except metallurgical processes involving refinement of steel additives.”
- Fasteners are considered COTS products and need only be manufactured in the U.S.; the source of components, including the iron or steel does not matter.
- The evaluation cost penalty for offers of end products or construction material that do not qualify as domestic is increased from 6% to 20%, and from 12% to 30% where the potential domestic awardee for the end product qualifies as a small business.
The comment period for the proposed rule extends through November 13, 2020.
Contacts
Insights
Client Alert | 5 min read | 06.05.26
The Office of Management and Budget issued on May 29, 2026 a Proposed Rule that would significantly revise the Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards (Uniform Guidance) at 2 C.F.R. Part 200, potentially impacting the full lifecycle of federal grants, cooperative agreements and other forms of financial assistance, from pre-award merit review through post-award administration and termination. These proposed changes are designed to implement the President’s policy priorities, executive actions related to diversity, equity and inclusion (DEI) activities, and Executive Order No. 14332, Improving Oversight of Federal Grantmaking (EO 14332).
Client Alert | 5 min read | 06.04.26
EU Pay Transparency Directive: The Transposition Deadline is Looming — What Now?
Client Alert | 4 min read | 06.04.26
Surveillance Pricing Update: California’s Sweeping AB 2564 Passes Assembly and Heads to Senate
Client Alert | 4 min read | 06.04.26
USTR Proposes Sweeping Tariffs as Part of Section 301 Forced Labor Import Enforcement Investigation