Cancellation Of RFP Upended
Client Alert | less than 1 min read | 08.18.05
In Rand & Jones Enters. Comp., Inc. (Aug. 4, 2005 http://www.gao.gov/decisions/bidpro/296483.htm), GAO held that Veterans Affairs lacked a reasonable basis for canceling an RFP when the cancellation was based on no technical evaluation factors in the RFP and the agency intended to issue an IFB for the same requirement. Both the RFP and IFB would be based on the same evaluation factor (price), no evidence suggested that the government or the integrity of the procurement system would be prejudiced if the RFP were not cancelled, and the low offeror would be prejudiced by recompetition since its low price had previously been disclosed publicly.
Insights
Client Alert | 15 min read | 08.20.25
In this eighth alert in our weekly series on the EU Pharma Package, we continue our overview of initiatives with respect to security of supply and shortage prevention and mitigation. Our last alert looked at how the Pharma Package seeks to address these issues. However, the Pharma Package does not exist in isolation, and in this alert we will discuss the interplay between its measures and those contained in other important EU initiatives such as the proposed Critical Medicines Act (CMA), and the Medicinal Countermeasures Strategy and the EU Stockpiling Strategy.
Client Alert | 2 min read | 08.19.25
Client Alert | 4 min read | 08.19.25
Forged Faces, Real Liability: Deepfake Laws Take Effect in Washington State and Pennsylvania
Client Alert | 1 min read | 08.19.25