B&P Costs Don't Include Sub Costs Or Profit

Client Alert | less than 1 min read | 07.30.04

In Gentex Corp. v. U.S. (June 10, 2004), the Court of Federal Claims decided two issues of first impression for the court adversely to the contractor: (1) even when a solicitation specifically requests teams to respond, the B&P costs of teammates of the prime are not recoverable unless they are in a joint venture or in some other way are prime contractors themselves and (2) profit is not recoverable on the contractor's costs.

Insights

Client Alert | 6 min read | 09.11.26

It’s LIVE: The Cyber Resilience Act Reporting Is Mandatory as of Today - 11 September 2026

The wait is over. As of today, manufacturers of connected products (both hardware and software) must comply with the Cyber Resilience Act’s (“CRA”) vulnerability and incident reporting obligations. The CRA’s Single Reporting Platform (“SRP”), operated by the European Union Agency for Cybersecurity (“ENISA”), is now the EU-wide gateway through which those notifications must flow....