1. Home
  2. |Insights
  3. |Overview of Rules for Qualified Foreign Financial Institutions’ Investment in Listed Shares in Saudi Arabia

Overview of Rules for Qualified Foreign Financial Institutions’ Investment in Listed Shares in Saudi Arabia

Client Alert | 1 min read | 05.21.15

In July 2014, the Saudi Arabian Capital Market Authority (CMA) announced that it had been given approval to permit qualified foreign financial institutions (QFIs) to trade directly in shares listed on the Saudi Arabian Stock Exchange (the Tadawul), and that the CMA expected the Tadawul to be open to QFIs at some point during the first six months of 2015.

The CMA subsequently issued the Draft Rules for Qualified Financial Institutions' Investment in Listed Shares and invited interested parties to submit their comments and observations on the Draft Rules to the CMA no later than November 20, 2014. Having reviewed and considered the comments from interested parties about the Draft Rules, the CMA issued on May 4, 2015 the Rules for Qualified Foreign Financial Institutions' Investment in Listed Shares.

The CMA has confirmed that the opening of the Tadawul to foreign investors is intended to support the increased participation of institutional investors and reduce the role of retail investors. Financial institutions interested in trading in shares listed on the Tadawul should be aware of the formalities involved in securing the necessary regulatory consents, the ongoing requirements and the potential issues that still exist.

For an overview of the Rules, please click here to download a PDF.

Insights

Client Alert | 3 min read | 10.24.25

In a Move Affecting the Future of Data Centers, DOE Directs FERC to Act On Large Load Interconnections

On October 23rd, the U.S. Department of Energy (“DOE”) sent a letter to the Federal Energy Regulatory Commission (“FERC”) containing an Advance Notice of Proposed Rulemaking (“ANOPR”) with principles for all large load interconnections across the US, including those co-located with generating facilities.[1] Significantly, the Secretary of Energy states that the interconnection of large loads to the transmission system “falls squarely” within FERC’s jurisdiction, thus weighing in on a dispute that has been pending before FERC for over a year. This move appears to be a reaction to the continued pendency before FERC of the colocation dockets[2] and a technical conference on colocation held almost a year ago.[3]...